Quality Engineer with deep expertise in AS9100 compliance, supplier quality management, and first article inspection (FAI) per EN 9102. Manages non-conformance reporting (NCR) process and leads root cause analysis using 8D methodology. Experienced in NADCAP audit preparation for special processes.

Expertise

  • AS9100 Rev D compliance and internal auditing
  • non-conformance reporting (NCR) and 8D root cause analysis
  • first article inspection (FAI) per EN 9102
  • supplier quality audits and qualification
  • NADCAP special process auditing (welding, NDT, coating)
  • measurement system analysis (MSA)
  • statistical process control (SPC)

Technologies

SAP QM Minitab 8D Report AS9100 Rev D EN 9102 NADCAP FMEA PPAP MSA Excel

Work History

2024-10

Prepared company for NADCAP audit of welding special processes. Updated procedure set, conducted mock audit, trained 6 welders on documentation requirements, achieved NADCAP accreditation on first attempt.

Challenge: NADCAP welding checklist has 180+ requirements. Identified 12 gaps in our existing procedures 4 months before the audit — enough time to close all of them without rushing.

Learned: Starting NADCAP preparation 6 months before the audit is the minimum. Starting 3 months before guarantees stress. NADCAP auditors find things that internal audits miss.

NADCAP AS9100 Rev D SAP QM

2024-03

Conducted first article inspection (FAI) per EN 9102 for 8 new parts entering production. Reviewed design documentation, material certifications, process records, and dimensional measurement report.

Challenge: Two parts failed FAI on surface roughness — supplier used wrong cutting parameters. Required supplier to resubmit with corrected machining process and updated control plan.

Learned: FAI is the quality gate before production starts. Passing all 8 parts at first submission is rare — the value of FAI is catching problems before 50 units are made, not just at unit 1.

EN 9102 SAP QM Excel CMM software

2023-07

Managed 14 non-conformance reports (NCRs) on machined parts from a new supplier. Used 8D methodology for root cause analysis — identified that the supplier's CNC program had an outdated tool offset table.

Challenge: The supplier initially rejected the NCR, claiming dimensions were within their internal tolerance. Provided measurement data from our CMM vs their CMM — found 0.02mm systematic offset indicating calibration difference.

Learned: NCR disputes with suppliers are often measurement system disagreements, not process failures. Always verify CMM calibration chain and measurement method before escalating.

SAP QM 8D Report Minitab

2023-01

Led AS9100 Rev D internal audit across manufacturing, engineering, and procurement departments. Issued 7 minor findings and 2 major findings. Tracked corrective actions to closure before external audit.

Challenge: One major finding (missing risk-based approach in procurement) required process redesign, not just a procedural fix. Worked with procurement lead to define supplier risk tiering criteria and update the procedure.

Learned: Major audit findings almost always reveal a process gap, not just a documentation gap. Fixing only the documentation without addressing the underlying process will result in a repeat finding.